An M12 on a Kohl’s remittance means Kohl’s paid you for fewer units than you invoiced. Some M12s are accurate, but many come from a split shipment still in transit or a receiving count that doesn’t match your records, and those decide whether you wait, write it off, or file a claim.
Kohl’s gives suppliers six months from receipt of goods to file a shortage claim, but Net 75 terms mean the deduction can surface well into that window. Knowing which M12s repay on their own and which need a claim is the difference between recovering the money and losing it to the clock.
What Is an M12 Shortage Deduction at Kohl’s?
M12 is Kohl’s code for a shortage deduction: an amount withheld from an invoice payment because Kohl’s recorded fewer units received than you billed.
Kohl’s pays automatically only when the purchase order, the invoice, and the verified receipt at the DC, eFC, or store all agree. When receipts come in below the invoiced quantity, Kohl’s deducts the gap.
Payment terms shape when you see it. Kohl’s pays Net 75 from receipt of goods at each location, not from the ship date or invoice date, so an M12 can surface well after the shipment left your dock. Kohl’s also asks suppliers to invoice by DC at the PO level; store-level invoicing is allowed but makes shortages harder to trace.
Why Kohl’s Charges Shortages on Complete Shipments
Split shipments are the most common cause of Kohl’s shortages on orders shipped in full. When part of a PO arrives later than the rest, Kohl’s pays the full invoice and deducts the units not yet received at the moment the invoice is released. Once the remaining units arrive, they match to the shortage, and Kohl’s repays it in the next payment cycle.
Here’s how that plays out on a $12,000 PO for 1,000 units at $12 each, shipped on two trailers, with 800 units received when the invoice is released (illustrative numbers):
|
Event |
Code |
Amount |
|
Invoice paid |
Payment |
$12,000 |
|
200 units not yet received |
M12 |
($2,400) |
|
Remaining 200 units received and matched |
A05 |
$2,400 |
|
Net after both cycles |
$12,000 |
A dispute filed before the second trailer is received chases money Kohl’s would have returned on its own. When a shortage lines up with a shipment still in transit, wait one payment cycle before filing.
Kohl’s Shortage Codes: M12, A05, and R…SHTG
Kohl’s shortage deductions appear as M12 on the EDI 820 remittance, and their repayments appear as A05. Shortage and cost price differences sit in the IT1 segments.
|
Code |
Meaning |
|
M12 |
Shortage deduction |
|
A05 |
Repayment of an M12 |
|
A5B |
Repayment of RTV, callback, or new-receipt-return deductions, or shortages |
|
A08 |
Buyer-approved repayment |
|
R…SHTG |
Shortage claim number, starting with “R” and ending in “SHTG” |
An M12 without a matching A05 after the next payment cycle is the one worth investigating. Keep M10 and A06 out of this workflow: those are cost price deductions and their repayments, and a cost difference filed as a shortage lands with the wrong research team.
Before You Dispute: Is the Kohl’s Shortage Valid?
A Kohl’s shortage claim is only as strong as your proof that the units shipped and arrived. Use this table to decide what to do with each M12:
|
What You Find |
What It Means |
Action |
|
Part of the PO is still in transit |
Wait one cycle for the A05 |
|
|
Your ASN, carton counts, and pick records show fewer units than invoiced |
Valid shortage |
Fix picking or invoicing; don’t dispute |
|
Records show the full quantity, and you have a signed BOL or POD for this PO |
Likely invalid |
File a shortage claim |
|
The amount is a cost difference (M10) |
Not a shortage |
Handle as a cost dispute |
|
The amount combines several POs |
Rolled-up deduction |
Break it down by PO before filing |
The proof must belong to the specific PO in question. A POD for a related shipment won’t support the claim.
How to File a Kohl’s Shortage Claim
Kohl’s handles shortage claims by email, sent to the AP inbox assigned to your vendor name. Each inbox covers vendors by the first letter of the vendor name: one address per letter from A through V, one shared address for W through Z, and separate addresses for Sephora and import vendors. The current list is in the “Kohl’s Supply Contacts” document on K-Link. A claim sent to the wrong inbox delays research before it starts.
Each claim email should:
- Cover one PO: multiple shortages on the same PO can share an email, but different POs cannot
- Name the claim in the subject line: include the PO number and the shortage or invoice number
- Carry the core support: the BOL, proof of delivery, and invoice copies
Adding the SKUs, quantities, units received versus not received, the dollar amount disputed, and your ASN and carton count records lets the research team match your claim against receiving data in one pass.
Once the email arrives, AP opens a case and routes it to the Order Verification and Transportation teams. Your AP representative sends the outcome when research is complete.
Kohl’s Shortage Dispute Window and Response Time
Kohl’s gives suppliers six months from receipt of goods to file a shortage claim, and research takes up to 6 to 8 weeks.
|
Claim Type |
Filing Window |
Expected Response |
|
Shortage claims |
Six months from Kohl’s receipt of goods |
Up to 6 to 8 weeks |
|
General payment disputes |
Six months from the invoice payment date |
Up to 10 business days |
The shortage clock starts at receipt of goods, while the deduction may not reach your remittance until near the end of Net 75 terms. That leaves less working time than “six months” suggests, so file as soon as an M12 clears your validity checks.
Kohl’s Rolled-Up Shortage Deductions
Kohl’s can combine several POs going to the same DC into one deduction, letting overages on one PO offset shortages on another. The result is a single amount that no longer maps to one shipment, and the DC detail may not carry through.
Break it apart before disputing. Identify every PO in the rollup, net the overages against the shortages for each one, and gather the BOL and POD for every PO involved. The amount worth disputing is the net shortage you can document, which is often smaller than the rolled-up total.
Whether the M12 is a single PO or a rollup, the rule is the same: Kohl’s shortage claims are won with PO-level proof, filed before the six-month window closes.
Turning M12 Lines Into Repayments
Kohl’s shortages reward suppliers who track every M12 against its A05, break rollups down by PO, and send each claim to the correct inbox with PO-level proof. Done by hand, that work slips behind the six-month clock.
Because Kohl’s handles shortage claims over email, most deduction software stops at the inbox. iNymbus doesn’t. It reads Kohl’s 820 remittances, pairs shortages with repayments, pulls the BOL, POD, and invoice for each PO, and writes and sends the claim email to the right AP address, alongside deductions from 52+ other retailers.
See how iNymbus files Kohl’s shortage claims without the inbox work.
